Boiler Construction performed by Lund Machine Works |
02/08/09 |
|
|
|
With the boiler
stripped, it was ready for Jeff Lund to take the boiler to his shop so the
construction of the new boiler could be started. Here Jeff and Brian
Patterson are balancing the old boiler so it can be loaded unto Jeff’s
trailer. |
Loading the Boiler. |
|
|
Loaded and
secured, ready for transport to New Ulm, MN. Monty Topp and Al Kroneman were
on hand to help load as well as Jeff and Brian. |
|
07/02/09 |
|
|
|
I made a trip up to Jeff Lund to check on
the boiler progress today. I found the shell laying outside his shop, seam
welded and past inspection |
Jeff had the firebox inside. He had it
tacked together and was planning to get it welded up on the weekend. |
|
|
Here Jeff is
showing off the steam dome. |
|
|
|
|
|